We are constructing a 28' x 40' pole barn with a 4' gable overhang. We are handling the whole job including: site clearing, excavation, building, electrical, insulation, and cement. More pictures to come as the barn goes up! Pictures above are after site clearing and excavation work was completed.
|
The above pictures are after day two of construction. Poles are set and the trusses are ready to go up, things are moving along rather nice.
|
Pictures above are after day three of construction, as you can see the trusses are set, and most of the purlins are in place for the roof.
|
|
|
|
|
 |
Trying to show how the screws all align. |
|
|
|
|
We're getting there, the roof is on, and most of the trim work (j-channel, boxing in the facia corners..ect) is about done. It won't be long now, hopefully the weather holds out another week for us!
|
Above pictures are of the finished barn minus garage doors, electric, cement and ceiling insulation. The electric is currently being installed with plans to install the ceiling insulation when finished. The garage doors should be in within the next week or so, we're waiting for them to come in(guess we put the barn up to fast, or maybe it has something to to with the holidays). The cement floor will be poured in the spring when the frost is out of the ground. More pictures to come when doors and insulation is finished.
|
Pictures above are of the finished barn with doors, insulation and electrical installed, cement will come in the spring when the frost is gone.
|
|
|